31 July 2010  |  Home   |  Site Map   |  Languages
Elspec... Innovative Power Quality Solutions
ELSPEC
Home Page
About Elspec
Markets
Products
Support
Contact Us
Agent Locator

Cranes

The complete operation cycle of harbor cranes is approximately one minute. During this time, the harbor crane requires variable amounts of reactive energy, fluctuating rapidly throughout the entire crane cycle.

The Elspec Equalizer’s real-time power factor correction system:
  • Eliminates reactive energy in real time
  • Provides voltage control
  • Reduces the current and voltage flicker
  • Allows installation of a smaller service (less cable, less heat)
  • Lowers system losses
  • Saves energy

Back to Industrial from Harbor Cranes.



 Case Studies

 


ELSPEC